2g PS Material Morden Design Injection Fork Tool with Strong Enough Design

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2018-08-03 10:37

  • Browse the number:

    261

Send an inquiries

Company Profile

Taizhou Oskai Mould

By certification [File Integrity]

Contact:aosikai(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.oskaimold.com/ http://aosikai.yuyaoguoli.com/

Product details
2g PS Material Morden Design Injection Fork Tool with Strong Enough Design

 



2g PS disposable fork mould

Mold Size

550x550mm / advice choose 250Ton injection machine

Mold cavity

25 cavities

Mold Steel

2344 steel, the original hardness is HRC32 degree

Mold steel treatment way

At final arranged vacuum quenching for core and cavity to HRC45 degree

Mold gate way

Semi-hot runner

Mold uselife

1000000 shots

Mold cycle time

15 sec

1st. Test mold time

35 days after confirmed mold drawing files

Mold exported to

K.S.A

Mold doff way

Choose HASCO ejectors system



FAQ:

-How to make sure this fork mould can be worked long time and without flash?

We arranged special treatment for the fork sharp work area then make sure not easy get flash, pls send mail to us for more details about treatment way. tks!


Process

Mold steel

P20, 718, 2738, 2344, 2316, S136, 3Cr13, 38CrMoAl, Mov and more

Mold cavity

1 or more (depend on client)

Surface treatments

electroplate (in order to prevent rust), thur. nitrogen (in order to rise surface hardness), vacuum quenching (in order to rise whole hardness)

Plastic materials

PP, PVC, PPR, ABS, PA, PC, POM, PS, PET, HDPE, LDPE and other

Software

UG, PRO-E, MOLDFLOW, CAD, CAE, VISI

Mold gate way

cold runner/hot runner/semi-hot runner

Mold base

HASCO, DME, LKM, HOME-MADE

Mold doff system

ejectors, off-plate, air valves, hydraulic jars, air jars, air ejectors, oil-motor and more

Mold cooling

Water cooling/air cooling/beryllium bronze cooling

Mold payment

50% down payment by T/T, 50% balance by T/T before shipment

Mold shipment

By sea/air/train

Mold packaging

packed into standard wooden cases

Mold quotation

most reasonable as rich experience


Technology

1) Mould structure design

Professional designers provide you with reasonably designed mould to shorten cycle hours.

Reducing unnecessary procedure improves efficiency.

2) Mould cooling system

According to the structural characteristics of the product and the appearance of the product , We design a reasonable form of gate for mould, such as a large gate, hidden gate, fan gate, needle gate, pin point gate etc., a reasonable channel of runner design make mold temperature balance in the shortest time to improve mould precision and productivity.

3) Accessory for mould

Slide, guide pin, guide sleeve, lifter blocks and so on are taken by wear-resistant standard parts, to ensure the mould life. 

4) Deal with mould

Quenching the mold, heat treatment to improve the hardness, then Nitriding temperature is lower , the mold will no longer need to quench mold with high surface hardness and wear resistance more than HV850


Service

1) We can repair the mould in one year for some free and provide technology. . 

2) Gurantee  period is 12months starting from the date of moulds accept in the Buyer’s factory.

3) If the moulds happen the big problem, The moulds cannot repaired, the Buyer cannot solve the problems,eg, mould crack, product  can’t moulding…any big problem(except the human error) due to the mould life can’t reach to guranteed shots.the Seller and Buyer's negotiate to slove the problem, the buyer can send it back to the factory to repair or If serious, the Seller have resposiblity to make new mould for the Buyer.


http://www.oskaimold.com/