Negotiable
The date of payment from buyers deliver within days
Jiangsu
Long-term effective
2017-08-08 05:24
225
Company Profile
Yizheng Tianyue Nonwoven Products Co., Ltd.By certification [File Integrity]
Contact:Mr. Chenyue(Mr.)
Email:
Telephone:
Phone:
Area:Jiangsu
Address:Jiangsu
Website: http://tianyue.yuyaoguoli.com/
Style No. | TYD-RZ | Amount of Drainage Holes (/sqm) | 22-50 | |
Fiber Composition | Straight Pile: Polyethylene (PE); Curved Pile: Polypropylene (PP) |
Manufacture Process | Tufting | |
Pile Height(mm) | 20-50mm | Total Weight (g/sqm) | * | |
Gauge (inch) | 3/8" | Roll Length (m) | 25 | |
Stitches Rate (/10cm) | 14 | Roll widths (m) | 4, 2 | |
Tufts Density/sqm | * | Quantity in 20' Container | 3250 | |
Fiber Color | as below pictures show | Quantity in 40' Container | 7000 | |
Yarn Weight (g/sqm) | * | Quantity in 40'HQ Container | 8250 | |
Dtex | 10000 | Grass Life | 5~8years | |
Colorfastness | DIN 54004 Sale 7 | Resistance of Fire | DIN 51960 Class 2 flammable | |
Primary Backing | PP woven fabric | Environmental Protection | No heavy metals | |
Secondary Backing | PP non-woven fabric | Necessory Installing accessories | Joint tape, Adhesive glue | |
Coating Backing | Styene-butadiene Latex | Application | artificial fake grass turf animal, back yard, public places, roof, green island, garden, exhibition, roadside, nursery, balcony and so on. | |
Diameter of Drainage Holes (mm) | 3~5 |
Quality assurance
1. On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2. Strictly in accordance with the ISO9001-2008 international quality system standard, we monitor and manage the whole process throughout production, quality testing, and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer's responsibility or irresistible natural disasters),we have refunding, replacement, and repair services. We will respond to customers' feedbacks on quality issues within 24 hours.
Manufacturing & Packing & Shipping
Step 1 | Extruding | Our stretching technology reaches the global leading standard with imported machine & all production process automated |
Step 2 | Tufting | World-class Tufting machine with advanced technology and superior equipment performance |
Step 3 | Coating | Two coating lines include:Latex coating and PU coating |
Step 4 | Packing | Roll widtn is 2 or 4m ;Roll Length can be customized |
Step 5 | Shipping | Inner packing: paper tube (10 cm inner size); Outside packing: Double PP woven bag |